Accelerated Bridge Construction

Accelerated Bridge Construction

Table Of Contents
  • Accelerated Bridge Construction (ABC)
  • Conventional Bridge Construction
  • Time Metrics For ABC
  • Onsite Construction Time
  • Mobility Impact Time
  • Prefabricated Bridge Elements And Systems (PBES)
  • Elements
  • Deck Elements
  • Beam Elements
  • Pier Elements
  • Abutment And Wall Elements
  • Miscellaneous Elements
  • Systems
  • Superstructure Systems
  • Superstructure/Substructure Systems
  • Total Bridge Systems
  • Glossary Of Terms
  • Chapter Introduction WHY ABC?
  • Purpose And Use Of This Manual
  • Intended Users
  • Decision Makers
  • Project Managers
  • Bridge Designers
Why Use Accelerated Bridge Construction?
  • Benefits Of ABC Projects Using PBES
  • Reduced Road User Impacts
  • Improved Worker And Motorist Safety
  • Expedited Project Planning Process
  • Improved Quality
  • Improved Constructability
  • Reduced Cost To Society
  • Positive Public Perception Of ABC
  • Public Response To ABC Projects
  • Chapter Accelerated Bridge Construction Technologies
  • Foundation And Wall Elements
  • Continuous Flight Auger Piles (CFA)
  • Geosynthetic Reinforced Soil Integrated Bridge System (GRS/IBS)
  • Prefabricated Pier Cofferdams
  • Rapid Embankment Construction
  • Expanded Polystyrene (EPS) Geofoam
  • Accelerated Embankment Preload Techniques
  • Column Supported Embankment Techniques
  • Prefabricated Bridge Elements And Systems
  • Prefabricated Elements
  • Prefabricated Systems
  • Structural Placement Methods
  • Self Propelled Modular Transporters (Spmts)
  • Longitudinal Launching
  • Horizontal Skidding Or Sliding
Other Heavy Lifting Equipment And Methods
  • Conventional Cranes
  • Fast Track Contracting
  • Accelerated Project Delivery
  • Design-Build (DB)
  • Construction Manager General Contractor (CMGC)
  • Contracting Provisions
  • Best Value Selection
  • A+B And A+B+C Bidding
  • Continuity Of The Construction Process
  • Incentive/Disincentive (I/D) Clauses
  • Warranties
  • Lane Rental
  • Applicability Of ABC Technologies To Different Bridge Projects
  • Rehabilitation Of Existing Bridges
  • Deck Replacement
  • Superstructure Replacement
  • Substructure Replacement
  • Replacement Of Existing Bridges And New Bridges
  • Staging
  • Full Closure And New Construction
  • Effect Of Structure Type On ABC Methods
  • Curved, Skewed And Flared Bridges
  • Bridges With Transverse Floor Beams
  • (Trusses And Widely Spaced Girder Bridges)
  • Box Culverts
  • Chapter PBES For ABC – Planning And Scoping Projects
  • ABC Decision Making Process
Decision Process For Selection Of Appropriate ABC Methods
  • Defining The Problem
  • Site Constraints
  • Staging Areas
  • Traffic Management
  • Right Of Way Issues
  • Utilities
  • Local Government Constraints
  • Structure Type Options
  • Flowcharts For Determination Of Appropriate ABC Methods
  • Example Project
  • Structure Type Selection Analysis Including Overall Project Costs
  • Cost Evaluation
  • Public Involvement
  • Chapter Implementing ABC In A Transportation Agency (A Case Study From The Utah
  • DOT)
  • General Approach: No Magic Bullet
  • Strategic Layers Of Implementation
  • Upper Management And Politics
  • Mid-Level And Organization
  • Project Level
  • Identify ABC Champions At All Levels
  • Stakeholder Buy-In
  • Scanning Tours
  • Demonstration Projects
  • The Role Of Innovative Contracting
  • PBES Decision Making Framework
Establish A “Program Of Projects”
  • Develop Specifications, Standards, And Standard Details
  • Communication
  • Measure And Share Successes
  • Conclusions
  • Chapter Prefabricated Bridge Elements
  • Materials
  • Structural Steel
  • Concrete (Normal Weight And Lightweight)
  • Timber
  • Aluminum
  • Fiber-Reinforced Polymer
  • Grouts
  • Grout Types
  • Ultra High Performance Concrete
  • Corrosion Resistant Reinforcing Steel
  • Stainless Steel
  • Low-Carbon, Chromium, Steel Bars
  • Coated And Galvanized Bars
  • Fiber Reinforced Polymer (FRP) Bars
  • Superstructure Elements
  • Beams And Girders
  • Steel
Precast/Prestressed Concrete
  • Stay-In-Place Deck Forming
  • Corrugated Steel
  • Partial-Depth Precast Concrete Deck Panels
  • Full-Depth Deck Panels
  • Precast/Prestressed Concrete
  • Steel Grid
  • Fiber Reinforced Polymer
  • Modular Superstructure Systems
  • Modular Steel Systems
  • Bridge Construction
  • Bridge Construction Examples
  • Bridge Construction Pdf
  • Bridge Construction Manual
  • Bridge Construction Techniques
  • Foundation Reuse In Bridge Construction
  • What Is Bridge Construction
  • Disadvantages Of Bridge Construction
  • Fastest Bridge Construction In India
  • Types Of Bridge Construction
  • History Of Bridge Construction
  • Bridge Construction Best Practices And Techniques
  • Bridge Construction Projects
  • Bridge Construction
  • Bridge Construction Examples
  • Bridge Construction Techniques
  • Bridge Construction Pdf
  • Bridge Construction Manual
  • Caltrans Accelerated Bridge Construction
  • Did A Bridge Collapse Today
  • Bridge Construction Conference
What Is Accelerated Bridge Construction